Intermediate Transom
Cuplock scaffold is a tubular system scaffold that uses the cup and blade locking mechanism for a fast, safe.
This consists of a horizontal steel tube with hooks which are designed to fit onto the horizontal standards of the scaffolding system.
The intermediate transom cuplock scaffold is installed between two horizontals at the mid-span of a bay to provide support for the planks in case there is a need to have a void at some point in the bay.
|
Code |
Description |
Material |
Finish |
|
CIT0914 |
Intermediate Transom 3’(914mm) |
48.3mmφ × 3.2mmT, Q235/Q355 |
H.D.G/Powder Coating |
|
CIT1219 |
Intermediate Transom 4’(1219mm) |
48.3mmφ × 3.2mmT, Q235/Q355 |
H.D.G/Powder Coating |
|
CIT2440 |
Intermediate Transom 8’(2440mm) |
48.3mmφ × 3.2mmT, Q235/Q355 |
H.D.G/Powder Coating |
Related products
-
Quick View
2026 Top 7 Polyurethane Clean Boards for Food Cleanrooms
Contact UsPolyurethane clean board adopts high-quality polyurethane core material, with high fire rating, excellent insulation performance, energy-saving and environmentally friendly, and long service life
-
Quick View
Vertical Standard
Contact UsThe Ringlock Scaffold verticals, also known as standards or uprights, are the vertical metal tubes that form the backbone of the RingLock scaffolding system.
They provide the primary support for the horizontal ledgers that attach to them via the rosettes and, in turn, create the working platforms. -
Quick View
Superior quality 800KG automatic sliding door opener 220VAC Sliding gate motor Automatic fast moving sliding door opener
Contact UsSuperior quality 800KG automatic sliding door opener 220VAC Sliding gate motor Automatic fast moving sliding door opener
-
Quick View
2026 | TOP 7 Quick Deploy Container Room Solutions for Rapid Construction
Contact UsFast assembling container houses are a new type of prefabricated building with “efficient assembly, flexible adaptation, and green economy” as its core






Reviews
There are no reviews yet.